Question: Question 2 [5 points] A tandem hard drive assembly line consists of four workers and two product models ('C' and 'F'). Each workers is allowed

 Question 2 [5 points] A tandem hard drive assembly line consists

Question 2 [5 points] A tandem hard drive assembly line consists of four workers and two product models ('C' and 'F'). Each workers is allowed to take two 15-minute breaks and one 30-minute lunch out of her own eight hour shift. An industrial engineer decides to analysis this system by measuring started time, completed time, and processing time of each product as shown in the following table. (a) [1 point] Which worker is the bottleneck? How do you physically identify the bottleneck worker in an operation? (b) [1 point] Which workers that you observe learning curve effect? Justify you answer (c) [1 point ] What are expected average and maximum throughput of this assembly line if a regular shift is 8 hours? (d) [2 points] If the speed of workers can be ranked from the slowest to the fastest as: A CB

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!