Question: Question 2 - Average Area End Method Your company is installing 5 0 0 linear feet of a 4 ' high 6 ' wide precast

Question 2- Average Area End Method
Your company is installing 500 linear feet of a 4' high 6' wide precast concrete box
culvert to carry stormwater. The bottom of the trench at the point of connection is at an
elevation of 1,235'. The existing ground surface elevation slopes at -75% BELOW
horizontal (falls) along the length of the box culvert. The bottom of the trench is required to
extend a horizontal distance of 2.5 outside each face of the box culvert. The sides of the
trench will be sloped at to 1 V