Question: QUeStION 2 Chloride has been injected into a 1 - D column continuously. The system has a discharge velocity of 5 . 8 1 0

QUeStION 2
Chloride has been injected into a 1-D column continuously. The system has a discharge velocity of 5.810-3m? day, the porosity of the medium is 0.3, and the longitudinal dispersivity is 5m.
a) What is the ClCC0 at 0.3m from the point of injection after 5 days?
b) Repeat (a) with a longitudinal dispersivity of 20m.
QUeStION 2 Chloride has been injected into a 1 -