Question 2: Design for maintenance
As the new Maintenance Manager at Brabs Plant, you face the challenge of a failing plant. The plant relies on four pumps operating in parallel to
manage critical processes. Out of these, three pumps are always operational, and one pump is kept on standby, under the assumption that only
one pump will fail at any given time and undergoes emergency maintenance. Over the past six years, the pumps have experienced an average
of 40 failures per year collectively. It takes approximately 2 hours to prepare for maintenance and 3 hours to repair each pump. Additionally,
pump maintenance is scheduled on bi-monthly basis.
Your objective is to improve the maintenance strategy to ensure that the pumps remain operational and efficient over the next 20 years. An
important aspect of this strategy is integrating design for maintainability principles to enhance long-term reliability and availability of the pumps.
The initial cost of these 4 pumps is R 480,000.00.
Question 2 : Design for maintenance As the new

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mechanical Engineering Questions!