Question: Question 2 Given the well data in Appendix A (see last page), and assume a 40 acre drainage area, calculate: a. The time required to

Question 2 Given the well data in Appendix A (see
Question 2 Given the well data in Appendix A (see last page), and assume a 40 acre drainage area, calculate: a. The time required to reach pseudosteady-state. b. The ow rate for transient ow 'orn time=0 to time to pseudosteady-state at wellbore owing pressures ranging from 0 to initial reservoir pressure. Display 5 equal increments for time and 10 for wellbore owing pressure. Plot the corresponding [PR curve. c. The ow rate for pseudosteadystate, if the ow boundary pressure equals the initial reservoir pressure and the wellbore owing pressure is 500 psi. d. The [PR curve for a reservoir at pseudosteadystate condition with average reservoir pressure equal to 5000 psi at the time of transition. Repeat for average reservoir pressure of 4500 and 4000 psi

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Mathematics Questions!