Question: Question 2: Multi-Stage Switching The traffic carried by a full-availability group of trunks is 4.5 Erlangs at the required Grade of Service (GOS) of 0.03.

Question 2: Multi-Stage Switching The traffic carried by a full-availability group of trunks is 4.5 Erlangs at the required Grade of Service (GOS) of 0.03. Grading is required to connect 38 outgoing trunks to switches. 1. Discuss any advantages or disadvantages of using a graded group of 2. 2. By adopting the best grading design criteria, design a grading using a homogeneous-skipped grading. Sketch your grading diagram. 3. Based on your design in (2) above, compare the traffic capacities with and without (full availability) grading. Question 2: Multi-Stage Switching The traffic carried by a full-availability group of trunks is 4.5 Erlangs at the required Grade of Service (GOS) of 0.03. Grading is required to connect 38 outgoing trunks to switches. 1. Discuss any advantages or disadvantages of using a graded group of 2. 2. By adopting the best grading design criteria, design a grading using a homogeneous-skipped grading. Sketch your grading diagram. 3. Based on your design in (2) above, compare the traffic capacities with and without (full availability) grading
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
