Question: Question (2): Solve the following LP problem: (10 marks) The Electro comp Corporation manufactures two electrical products: air conditioners and large fans. The assembly

Question (2): Solve the following LP problem: (10 marks) The Electro comp

Question (2): Solve the following LP problem: (10 marks) The Electro comp Corporation manufactures two electrical products: air conditioners and large fans. The assembly process for each is similar in that both require a certain amount of wiring and drilling. Each air conditioner takes 3 hours of wiring and 2 hours of drilling. Each fan must go through 2 hours of wiring and 1 hour of drilling. During the next production period, 240 hours of wiring time are available and up to 140 hours of drilling time may be used. Each air conditioner sold yields a profit of $25. Each fan assembled may be sold for a $15 profit. Required: I. a. Formulate the above as Linear Program. (3 marks) b. Solve this linear program graphically and illustrate the feasible region. (3 marks) c. Specify the profit value (1 mark) d. Determine the optimal quantities of X, Y. (1 marks) e. Calculate the Slack for constraint (1). (2 mark)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!