Question: a. b. As part of the negotiation agreement between the landowners and the Estate Developers, the developers are required to clear a portion of

a. b. As part of the negotiation agreement between the landowners and 

a. b. As part of the negotiation agreement between the landowners and the Estate Developers, the developers are required to clear a portion of the site for the landowners. Initial assessments of the existing land reveal that your company would have to clear 205,000.00m for the community. The following represent information gathered from an inventory conducted on the site: i. Twenty (20) number uncompleted building were on the site. ii. A Twenty-one (21) number Foundation Structures are on various locations on the site iii. Six (6) number Septic Tanks on the site iv. Thirty-one (31) wooden structures on the site The vegetation on the site is light vegetation with numerous trees girth not exceeding 500mm. V. vi. Volume of space occupied by all the building is 950m above the original surface. vii. Volume of space occupied by foundation structures is 549m below the original surface. viii. Volume of space occupied by Septic tanks is 80m below the original surface. ix. Volume of space occupied by wooden structures 30m above the original surface. Providing the CESMM3 codes for the work items AP (8 Marks) Describe according to the various work items using information provided by CESMM3 classification table. AP (7 Marks) The description of work items provided in b above should be used to prepare a draft Bill of Quantities. AP (10 Marks)

Step by Step Solution

3.50 Rating (160 Votes )

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock

a According to the information provided the CESMM3 codes for the work items would be as follows Unco... View full answer

blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!