Question: Question 20 Activity (M) (0) (P) Expected Duration A 15 12 18 15 B 12 10 15 12.16 C 10 8 16 10.66 D 20

Question 20 Activity (M) (0) (P) Expected

Question 20 Activity (M) (0) (P) Expected Duration A 15 12 18 15 B 12 10 15 12.16 C 10 8 16 10.66 D 20 17 23 20 E 5 4 7 5.16 F 13 10 15 12.83 G 14 12 17 H 16 13 18 I 4 2 7 4.16 J 4 3 5 4 K 6 9 **Note: calculations made using second equation on presentation slide. Calculations aren't rounded. Using the Three-Point Estimate, determine the expected duration of activity G 12.18 O 16.24 22.12 O 14.16 2 pts