Question: QUESTION 21 For bidding purposes, a _______________ is evaluated based upon area measured. Fencing Earthwork excavation Sewer lines None of the above QUESTION 22 In

QUESTION 21

For bidding purposes, a _______________ is evaluated based upon area measured.

Fencing

Earthwork excavation

Sewer lines

None of the above

QUESTION 22

In general, it is recommended to permit the inspector to order the contractor to stop operations. True False

QUESTION 23

In federal agency projects, it is the inspector's responsibility to determine the specific needs of the types of construction records that must be established and maintained throughout the project. True False

QUESTION 24

In general, soil is classified as _______ grained if most of its sample weight passes the #200 sieve.

Fine

Medium

Smooth

Coarse

QUESTION 25

It is recommended that the inspectors assumes contractor' s possible mistakes rather than deliberate dishonesty and poor work. True False

QUESTION 26

It is possible to allow significant deviations from plans and specifications without a change order provided that no cost or time extension is involved. True False

QUESTION 27

It is acceptable to use the number of truckloads of loose material in determining earthwork volume. True False

QUESTION 28

According to OSHA, a cohesive soil is classified as type ____.

A

B

C

D

QUESTION 29

If the subcontractor allowed his/her crew to be exposed to hazards that could cause serious physical harm or death, who should be held liable for that?

The designer

The subcontractor

The General Contractor

Both of b and c

QUESTION 30

In federal contracts, a CQC representative is responsible for conducting all inspections. True False

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!