Question: Question 211 ptsA Boeing supplier uses statistical process control to monitor its process for manufacturing metal brackets. The brackets are supposed to be 5.00 cm

Question 211 ptsA Boeing supplier uses statistical process control to monitor its process for manufacturing metal brackets. The brackets are supposed to be 5.00 cm long, and the firm has established a 3-sigma upper control limit (UCL) of 5.03 cm when sampling 36 units. A client wants to assess the process capability. What is the Cp of the process if the lower and upper specification limits (LSL and USL) are 4.8 cm and 5.2 cm , respectively (choose the closest answer)?.3331.112.121.678.33