Question: QUESTION 24 10 points Save Answer When the Work-in-Process (WIP) is 2000. If we assume that this process is designed to work 24 hours. What

QUESTION 24 10 points Save Answer When the Work-in-Process (WIP) is 2000. If we assume that this process is designed to work 24 hours. What is the Utilization of this process? For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac). BIUS Paragraph v Arial 10pt E X2 X2 - + V ... P O WORDS POWERED BY TINY QUESTION 25 10 points Save Answer 2000 WIP? When the Work-in-Process (WIP) is 2000. Suppose the steps in activity D are made easier, so the activity time per unit in step D is reduced by 50% (to 0.25 min per unit). If all the other settings remain the same, by how much does the productivity of the entire process increase in processing this For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac). BIUS Paragraph Arial 10pt E x2 X2 - + ABC ... O WORDS POWERED BY TINY
Step by Step Solution
There are 3 Steps involved in it