Question: Question 25 (1 point) A work sampling study requires an acceptable error level of 10 percent and z = 2 for 95.45 percent confidence. The

Question 25 (1 point) A work sampling study

Question 25 (1 point) A work sampling study requires an acceptable error level of 10 percent and z = 2 for 95.45 percent confidence. The adequate sample size is if the sample proportion is thought to be as large as 50 percent, but if the sample proportion is thought to be about 20 percent. 50; 20 100; 64 100; 16 20; 50 cannot be determined from the information given