Question: Question 3 [ 2 0 points ] : A manager of a plastic manufacturing facility is not sure what material handling equipment he should use
Question points: A manager of a plastic manufacturing facility is not sure what material handling equipment he should use in the production line. If you know that he needs to move materials in large quantities and with different sizes and weights, and that movement can be done in batches. An industrial engineer proposed using AHP to help the manager examine which material handling equipment they should use for their manufacturing needs. This engineer collected the following tables for you.
Table Weights of the different selection criteria
tableCapital Cost,O&M Lifetime,FlexibilityCapital Cost,O&MLifetimeFlexibility
Operations & Maintenance
Table Relative rank for each of the MHE vs selection criteria
tableCapital cost,tableOperations andmaintenance costLifetime,FlexibilityConveyer belt,ForkliftDollycartAutomated guided vehicle,
a Develop a complete AHP method and show all calculations and final results.
b Prepare the required tables for alternatives MHE vs selection criteria
c What MHE do you recommend for this facility
d List pros and cons of the first alternatives MHE you recommend to this manufacturing facility
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
