Question: Question 3 [ 2 0 points ] : A manager of a plastic manufacturing facility is not sure what material handling equipment he should use

Question 3[20 points]: A manager of a plastic manufacturing facility is not sure what material handling equipment he should use in the production line. If you know that he needs to move materials in large quantities and with different sizes and weights, and that movement can be done in batches. An industrial engineer proposed using AHP to help the manager examine which material handling equipment they should use for their manufacturing needs. This engineer collected the following tables for you.
Table 1. Weights of the different selection criteria
\table[[,Capital Cost,O&M ?+,Lifetime,Flexibility],[Capital Cost,1,12,3,5],[O&M,2,1,2,7],[Lifetime,13,12,1,3],[Flexibility,15,17,13,1]]
Operations & Maintenance
Table 2. Relative rank for each of the MHE vs selection criteria
\table[[,Capital cost,\table[[Operations and],[maintenance cost]],Lifetime,Flexibility],[Conveyer belt,6,6,6,2],[Forklift,2,3,8,7],[Dolly/cart,9,9,4,9],[Automated guided vehicle,5,6,5,5]]
(a) Develop a complete AHP method and show all calculations and final results.
(b) Prepare the required tables for alternatives (MHE) vs. selection criteria
(c) What MHE do you recommend for this facility
(d) List pros and cons of the first 2 alternatives (MHE) you recommend to this manufacturing facility
 Question 3[20 points]: A manager of a plastic manufacturing facility is

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock