Question: Question 3 . ( 2 5 pts ) The sewerage system of a city has already been designed and the wastewater treatment plant has been

Question 3.(25 pts)The sewerage system of a city has already been designed and the wastewater treatment plant has
been constructed. Calculate the total flow rate to the treatment plant and design the discharge pipe
from the wastewater treatment plant to the river.
(q=0.01Ls?m,k=2,hdmin=1.5,hdmax=4m,Vmin=0.5ms,Vmax=2.5ms,hDmin=10%,hDmax=65%,
Jmin =0.003,n=0.013.)
Note: The discharge to the river should be made such that the discharge pipe's top elevation coincides
with the ground surface.
In a 1500mm diameter sewer system with 0.0008 slope, an overflow structure is going to be built as shown in the figure below. The wastewater treatment plant is in the downstream of this pipe and has a capacity of 145000m3d. To prevent any flooding at the treatment plant, the overflow structure shown in the figure below is constructed to divert the excess flow into underground storage tanks where it will be pumped to treatment plant later during dry weather conditions. Calculate the height of the weir so that the flow over 145000m3? day can be diverted into storage tanks. The Manning's roughness coefficient of the pipe is n=0.013.
Question 3 . ( 2 5 pts ) The sewerage system of a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!