Question: QUESTION 3 (20 Marks) A. As a production planner for Korie Ingredients (M) Sdn Bhd, you have been given a bill of material for a

QUESTION 3 (20 Marks) A. As a production planner

QUESTION 3 (20 Marks) A. As a production planner for Korie Ingredients (M) Sdn Bhd, you have been given a bill of material for a product called Zig Zag. The product is made up of a D, two E, six F and 3 G. The D has 3 K and the E is assembled from 1 H and 3 N. Whereas, the G is assembled from 2 N. H consists of 2 J, 2K and 4 M. Each N has 1 J and 2 K. Each K has 1 L and 1 M. i. Based on the information above, generate a product structure for the Zig Zag. Show clearly the level and quantities of each item. (5 marks) ii. Determine the amount of K and M needed per one unit of Zig Zag. (3 marks) iii. Inventory on-hand for Zig Zag are shown in Table 2.1. Determine the net quantities required for item item K and M if the demand of Zig Zag is 125 units. (5 marks) Table 2.1: Inventory record Part Inventory on hand D 220 E 125 F 10 G 55 H 0 N 0 J 1500 K 0 L 3000 M 1700

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!