Question: Question 3 . ( 3 0 points ) For a rain duration of 2 hours, streamflow was observed in a creek as reported below. The

Question 3.(30 points)
For a rain duration of 2 hours, streamflow was observed in a creek as reported below. The baseflow of the stream before the event was 10 cfs and it will be taken as constant throughout the event. Drainage area of the creek is 2.5km2.
\table[[Time (h),1,2,3,4,5,6,7,8,9,10],[Rainfall (in),1.5,1.5,,,,,,,,],[Streamflow (cfs),60,280,340,284,204,128,68,36,16,10]]
a) Calculate the surface runoff generated by the storm in [mm and inch] and estimate the ordinates of a 2 h unit hydrograph of this catchment [cfs/inch]. Start with time =0 and Q=10cfs(baseflow).
b) Estimate the maximum soil retention parameter S of the SCS Curve number method based on the rainfall and runoff observations above and find the Curve Number value of this watershed based on S. You are using the experimental evidence here not a CN table. This is often done at project site where flow data is collected. Given runoff, think about how you can estimate S.
c) Calculate the runoff from a storm depth of 4 inches that lasts for 4 hours using this SCS maximum retention parameter you estimated above. Plot the 4-hour runoff hydrograph for this event assuming an initial baseflow of 18 cfs in the creek.
Question 3 . ( 3 0 points ) For a rain duration

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!