Question: Question 3. (30 points) Consider a facility location project as shown in the table below. Assume the project has a fixed cost of $100 per

Question 3. (30 points) Consider a facility location project as shown in the table below. Assume the project has a fixed cost of $100 per day, but money can be saved by shortening the project duration. Normal Activity Predecessor Crash Increase (1st, 2nd, 3rd day) Normal Cost Crash Time (day) Time (day) 6 4 $300 400 B A 8 6 $40, 80 50, 85 45, 70 60 A 7 350 5 D B,C 9 500 oooo E 8 600 a. (8 pts) Draw the AON diagram and find the Critical Path, Duration of the project and Total cost of project. b. (14 pts) According to the minimum cost schedule find the optimal way of crashing the project. What is the total project cost? (Crash the project step by step) C. (8 pts) According to the minimum time schedule find the optimal way of crashing the project. What is the total project cost? (Crash the project step by step)
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock