Question: Question # 3 [ 6 0 pts total ] Question # 3 a [ 2 0 pts ] Identify ( list ) the critical lane

Question #3[60 pts total] Question #3a [20 pts]
Identify (list) the critical lane groups for each phase and determine the sum of the flow ratios for
the critical lane groups.
Question #3b [10 pts]
Determine both the minimum cycle length (Cmin) and the Webster optimal cycle length (Copt).
Round both cycle lengths up to the nearest 5 seconds.
Question #3c pts
An isolated, pre-timed signalized intersection with 1 left-turn lane and 1 through/right-lane on each
of the four approaches has the following timing phase plan. The volumes (arrival rates) for each
movement, and the phase plan are shown in the following image.
For each phase, the startup lost time is 2.5 seconds and the clearance lost time is 1.5 seconds. The
speed of traffic is 40 mph on all approaches, the design vehicle is 20 ft , all lanes are 12 ft wide,
and all approaches are on a level grade. The desired degree of capacity utilization is 0.95. The
saturation flow rates for each movement are shown in the following table.
Question # 3 [ 6 0 pts total ] Question # 3 a [ 2

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!