Question: Question 3 A lab performs two types of blood tests, A and B. The time per setup (in minutes), processing time (in seconds), and order

Question 3 A lab performs two types of blood tests, A and B. The time per setup (in minutes), processing time (in seconds), and order size (number oftests) is given below. Each test requires a new setup. Determine the total capacity required for this lab in minutes. Blood test A = 9.5 minutes (Setup), 98 minutes (processing time), 600 orders (# tests) Blood test B = 8.0 minutes (setup), 68 minutes (processing time), 400 orders (# tests)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts