Question: Question 3 : A road section from 5 ta 1 4 + 5 5 0 to Station 1 4 + 6 5 0 has following
Question : A road section from ta to Station has following data all data in metera Prepare the earthwork Estimate required for this road section neglectiog the wastage. Assume the road a rection is meters wide with : side slopes:
tableStationNatural Ground Level,Deslzn Elevation
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock