Question: Question 3 : A road section from 5 ta 1 4 + 5 5 0 to Station 1 4 + 6 5 0 has following

Question 3: A road section from 5 ta 14+550 to Station 14+650 has following data (all data in metera) Prepare the earthwork Estimate required for this road section neglectiog the wastage. Assume the road (a) rection is 14 meters wide with 1:1 side slopes:
(20)
\table[[Station,Natural Ground Level,Deslzn Elevation],[14+550,450.86,450.50],[14+600,452.56,451.50],[24+650,451.80,452.50]]
Question 3 : A road section from 5 ta 1 4 + 5 5 0

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock