Question: Question 3 : A tunnel with a rectangular cross - section has been excavated horizontally in a north easterly direction at a width of 5

Question 3:
A tunnel with a rectangular cross-section has been excavated horizontally in a
north easterly direction at a width of 5 m and height of 3 m and on a bearing of 68
to true North. A joint is visible at floor level in the North Western wall of the tunnel
6 m back from the face of the tunnel. The joint reaches the roof of the tunnel at
the 1 m from the face of the tunnel. It is also visible in the roof and intersects the
face 2 m from the north western wall.
What is the apparent dip angle of the joint in the wall and what is the true dip
angle and dip direction of the joint?
What potential instability mechanisms might arise as the tunnel face is
advanced? Use diagrams and detailed notes for each step.
Question 3 : A tunnel with a rectangular cross -

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!