Question: Question 3: Activity based costing (20 marks in total) The Accountant for Pix Photographic supply Ltd has estimated the following activity cost pools and activity
Question 3: Activity based costing (20 marks in total)
The Accountant for Pix Photographic supply Ltd has estimated the following activity cost pools and activity drivers for the coming year:
| Activity | Budgeted overhead cost $ | Activity driver | Required level for activity driver | Cost per unit of activity driver |
| Machine setups | 300,000 | No. of setups | 100 | $3,000 per setup |
| Material Handling | 150,000 | Weight of raw material | 50,000 kg | $3 per kg |
| Hazardous waste control | 75,000 | Weight of hazardous chemicals used | 10,000 kg | $7.50 per kg |
| Quality control | 112,500 | No. of inspections | 1,000 | $112.50 per inspection |
| Other overhead costs | 300,000 | Machine hours | 20,000 | $15 per machine hour |
| Total | 937,500 |
An order for 1,000 boxes of film development chemicals has the following production requirements:
| Machine setups | 4 setups |
| Raw material | 10,000 kg |
| Hazardous materials | 2,000 kg |
| Inspections | 10 inspections |
| Machine hours | 500 machine hours |
Required
- Calculate the total overhead that should be assigned to the order for development of chemicals.
- What is the overhead cost per box of chemicals?
- If Pix Photographic Supply wee to use a plant-wide predetermined overhead rate based on machine hours, calculate he rate per hour.
- Under the approach in requirement 3, how much overhead would be assigned to the order for development chemicals:
- in total
- per box of chemical?
- Explain why these two product costing systems result in such widely differing costs. Which system do you recommend? Why?
- Calculate the unit cost of a production order for 100 specially coated plates used in film development. In addition to direct material costing $180 per plate and direct labour costing $60 per plate, the order requires the following:
| Machine setups | 2 setups |
| Raw material | 800 kg |
| Hazardous materials | 300 kg |
| Inspections | 3 inspections |
| Machine hours | 50 machine hours |
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts