Question: Question 3 (b) (15 marks) b) The original contract was signed in the sum of $80,750,225.00 with the adjustments as summarized as follow:- The material

Question 3 (b) (15 marks) b) The original

Question 3 (b) (15 marks) b) The original

Question 3 (b) (15 marks) b) The original

Question 3 (b) (15 marks) b) The original contract was signed in the sum of $80,750,225.00 with the adjustments as summarized as follow:- The material delivered to site were not properly stored and the Contractor has to make replacement costing $105,000.00. The thickness of the partition walls is changed from 175 mm to 125mm as per Engineer's instruction, resulting a saving of $672,500.00. The Contractor has rectified some substandard works by the domestic subcontractor and the rectification cost is $205,000.00. The depth of beam is reduced from 750mm diameter to 450mm diameter as per Engineer's Instruction and saved $317,225.00 The provisional sum in the contract for Built in Cabinet is $225,000.00 comprising of One set type A priced at $150,000.00 /set and One set Type B priced at $75,000 /set. Now the Engineer has confirmed to use a total 25 sets comprising of 12 sets of Type and 13 sets of Type B. The Contractor makes good defective work costing $220,000.00 > The Engineer issued instruction to revise the size of all columns from 550mm diameter to 750 diameter incurring a cost of $205,000.00 - The Contractor submitted a claim of $775,000.00 for Loss \& Expense and the Engineer approved an amount of $502,000.00. The provisional sum for Landscaping is $1,050,000.00 but now the Landscaping is no longer required and is 4 deleted as per Engineer's Instruction The provisional sum for Security Alarm System is $75,000.00 for ten sets @ $7,500/ set but now the Engineer has instructed to install extra 7 sets of the Alarm System. Calculate the final contract sum based on the above given information

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!