Question: question 3 only. hi please answer with work 2. The machines at Sweetie White Drinks Enterprise are designed to produce 1000 bottles of drinking bottles

question 3 only. hi please answer with work 2. question 3 only. hi please answer with work
2. The machines at Sweetie White Drinks Enterprise are designed to produce 1000 bottles of drinking bottles in every hour. The company operates 18 hours per day and continues for a week. As always, workers are given a rest period of 90 minutes. In addition, a routine of machines preventive maintenance usually takes 1.5 hours per day. The company also experienced machine breakdowns and late raw materials which accumulated of 45 minutes per day. Find out the answers for those questions. (6 Marks) a) Design capacity > 7 days + 3 Shifts x b) Effective capacity c) Actual output 3. The company sampled five orders with each four observation and the results as shown in the table below. The standard deviation of the process is 0.02 Sample Sample 2 Sample 3 Sample 4 Sample 5 x bar 12.10 12.12 12.11 12.10 12.12 2. The machines at Sweetie White Drinks Enterprise are designed to produce 1000 bottles of drinking bottles in every hour. The company operates 18 hours per day and continues for a week. As always, workers are given a rest period of 90 minutes. In addition, a routine of machines preventive maintenance usually takes 1.5 hours per day. The company also experienced machine breakdowns and late raw materials which accumulated of 45 minutes per day. Find out the answers for those questions. (6 Marks) a) Design capacity > 7 days + 3 Shifts x b) Effective capacity c) Actual output 3. The company sampled five orders with each four observation and the results as shown in the table below. The standard deviation of the process is 0.02 Sample Sample 2 Sample 3 Sample 4 Sample 5 x bar 12.10 12.12 12.11 12.10 12.12

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!