Question: Question 36 (1 point) A schedule that shows the components required at each level of the assembly and, based on lead times, calculates the time

Question 36 (1 point) A schedule that shows the
Question 36 (1 point) A schedule that shows the components required at each level of the assembly and, based on lead times, calculates the time when these components will be needed called: 1) the Material Requirements Plan 2) the Master Production Schedule 3) the Inventory control Plan 4) B&C

Step by Step Solution