Question: Question 3.a (Please show all the work clearly) A weaving machine with the following specifications: Loom Speed = 900 picks/min. Pick Density = 20 picks/cm

Question 3.a (Please show all the work clearly) A weaving machine with the following specifications: Loom Speed = 900 picks/min. Pick Density = 20 picks/cm Weaving Efficiency = 90% Loom Width (Reed Width) = 220 cm Calculate: a. Production in meter of cloth per hour (5 points) b. Rate of Filling Insertion (2 points) c. Production in m of cloth per hour, if the fabric width is 180 cm (2 points) d. How many weaving machines are needed to weave 250,000 meter (4 points) of cloth/year (assume 5 days/week, 24 hrs/day, 50 weeks/year)
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts