Question: Question 4 [ 1 2 ] A company makes 2 0 0 batches of a certain product, per month. The batch size is 1 0
Question
A company makes batches of a certain product, per month. The batch size is units. The entire manufacturing process involves machines. Setup time is hour, operation time mathrm~min per unit. Nonoperation time hours.
The plant operates hours per day, days per month. If waste is negligible, determine:
The manufacturing leadtime for a batch
The annual plant capacity
The plant utilization
Question
A batch production process has a batch size of units and a setup time of hour min Part handling time is seconds. Processing time is min A new tool must be used every parts. Tool changes take min to complete.
Calculate the average cycle time
Calculate the batch time
Calculate the production rate
Question
A machine shop has machines. The setup time averages hours. Batch size is The average operation time minute. The shop operates hours per day, days per month. Scrap losses are negligible.
Calculate the monthly production capacity.
Question
An NC machine has a leadscrew with pitch mathrm~mm and is connected to a servomotor with a gear ratio of : turns of the motor for each turn of the lead screw An optical encoder is connected directly to the lead screw and generates pulses mathrmrev of the lead screw. The feed rate is mathrm~mmmathrmmin Determine:
The pulse count received by the control system to verify that the table has moved exactly mm
The pulse rate
Motor speed
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock