Question: Question 4 [ 1 5 Marks ] You are the Cost Accountant of Chester Construction ( Pty ) Ltd , and your company manufactures four

Question 4
[15 Marks]
You are the Cost Accountant of Chester Construction (Pty) Ltd, and your company manufactures four products (roof tiles, floor tiles, cement and bricks) using the same machinery and processes. You compiled the following information relating to the existing production period:
\table[[,,\table[[Material cost],[per unit],[Product]],\table[[Direct labour],[cost per unit]],,Machine time],[Volume,R,R,per unit,,],[Roof Tiles,650,6.00,0.60,0.30,3.60],[Floor Tiles,6050,6.00,0.60,0.30,3.60],[Cement,770,19.00,2.40,1.20,14.40],[Bricks,8450,20.00,1.80,1.80,10.80]]
Total production overheads are as follows:
\table[[,R
Roof Tiles 1.44
Floor Tiles 1.44
Cement 5.76
Bricks 5.64
An analysis of production overhead activities for the period revealed the following:
Product No.
set-ups
No.
Material
orders
No.
times material
was handled
No.
spare parts
Roof Tiles 1133
Floor Tiles 86137
Cement 3151
Bricks 116156
Required:
Calculate the overhead cost driver rate by filling in the missing figures in the table
below:
Show all calculations and round off calculations/answers to 2(two) decimal
places.
Overhead Overhead
cost
(R)
Cost driver Cost driver
value
(R)
Cost driver rate
(R)
Machine
Set-ups
Materials
ordering
Materials
handling
Spare parts
 Question 4 [15 Marks] You are the Cost Accountant of Chester

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!