Question: Question 4 10 points Save Answer BILD-RITE Inc. makes two products and is currently using a predetermined overhead rate based on direct labour hours to

 Question 4 10 points Save Answer BILD-RITE Inc. makes two products

Question 4 10 points Save Answer BILD-RITE Inc. makes two products and is currently using a predetermined overhead rate based on direct labour hours to apply overhead. The total estimated overhead COST is $864,000 for the coming year. Data for these products for the upcoming year is shown below. Direct Materials Cost per Unit Direct Labour Cost per Unit Direct Labour Hours per Unit Number of Units Produced Product A $19.50 $9.00 0.6 30,000 Product B $33.00 $4,50 0.3 120,000 These products do have some level of customization for each specific customer. Management is now considering the implementation of an activity based-costing system where 50% of the overhead would continue to be allocated on the basis of direct labour hours and the remainder allocated on the basis of engineering design time. The time is expected to be distributed as follows for the upcoming year: Product 4,500 Product 4,500 Fngineering Design Time (in hours) Total 9.000 Calculate the total product cost per unit for product A using the proposed activity-based costing system. COSTAJ Enter your answer with no rounding Enter the dollar and decimal and cents. For example: 46.78 do not enter dollar signs

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!