Question: QUESTION 4 [ 2 0 Marks ] a ) Explain the usage of air valves in water pipelines construction; and list down and sketch out

QUESTION 4[20 Marks]
a) Explain the usage of air valves in water pipelines construction; and list down and sketch out using symbols the fittings and accessories required to construct drainage crossing cross a 1.5 m width drains and the location of air valves.
[6 marks]
b) Explain the term 'Budgets' and 'Estimates' in the context of civil engineering construction projects and provide a detail estimate of a 1.5 km drain construction. Drain is 500 mm wide and 1000 mm depth.
[8 marks]
c) Design a Bills of Quantity for a cast in situ concrete single storey house including foundation and metal roof structure.
[6 marks]
QUESTION 4 [ 2 0 Marks ] a ) Explain the usage of

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!