Question: Question ( 4 ) ( 2 . 5 points ) A curve is needed to connect a - 5 % grade to a - 1

Question (4)(2.5 points)
A curve is needed to connect a -5% grade to a -1% grade. The design speed is 45mph and the
acceptable deceleration rate is 10ftsec2. The driver's reaction time is 2.5sec. For the curve, the
stopping sight distance (SSD) is most nearly (you must show the steps needed to solve the problem)
Question ( 4 ) ( 2 . 5 points ) A curve is needed

Step by Step Solution

There are 3 Steps involved in it