Question: Question 4 ( 2 5 pts ) : Due to crashes at a railroad crossing, an overpass ( with a roadway surface 2 6 ft

Question 4(25 pts ): Due to crashes at a railroad crossing, an overpass (with a roadway surface 26 ft above the existing
road) is be constructed on an existing highway with a -1% grade. Sec illustration below. The existing highway has a design
speed of 55mihr. The overpass structure is to be level and centered above the railroad. Assume that the sag and crest
vertical curves are directly connected (i.e., there is no constant grade section). Determine the length from the PVC of the
sag vertical curve to the PVT of the crest vertical curve. Hint: you will need to first solve for the grade of the connecting
tangent indicated in the drawing. This connecting tangent is the final grade of the sag vertical curve and the initial grade of
the crest vertical curve.
Question 4 ( 2 5 pts ) : Due to crashes at a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!