Question: Question 4 (25 marks) At the early pre-construction phase, you have been asked to estimate the cost of constructing a motel for a site in

 Question 4 (25 marks) At the early pre-construction phase, you havebeen asked to estimate the cost of constructing a motel for a

Question 4 (25 marks) At the early pre-construction phase, you have been asked to estimate the cost of constructing a motel for a site in Wollongong. Your client requires a 1,750m motel, constructed of brick veneer. The ensuite rooms at the motel will each be 30m. The motel will be single storey. The motel has a 35,000 litre pool with deck, fencing, lighting and solar heating. a) Using the data provided in the Tables 2 and 3, you need to estimate a lump sum figure for the construction of the motel, including fitout. You should also include professional fees within your costing (Table 4). Note any assumptions you make. (15 marks) b) The same client is considering constructing an identical hotel in Bega. Using the Cordell Cost Guide Location Cost Factors (Figure 5), estimate the lump sum construction cost for the same motel in the second location. (5 marks) c) What other items would you need to include in order to estimate the total project cost? (5 marks) Costing notes: Allowance of 15% of GFA (gross floor area) for walls, ancillary spaces, plant rooms etc. 5% allowance for landscaping costs including parking area. Cost of fit out (per room): 34,800 AUD (up to 25 rooms) 27,600 AUD (26 to 50 rooms) 31,200 AUD (51 to 100 rooms) 24,000 AUD (more than 100 rooms) Table 2: Motel construction cost (Sydney) . . . 1,000 1,500 2,000 2,500 3,000 3,500 4,000 Exterior wall Construction cost per square metre floor area (AUD) 2,580 2,510 2,440 2,370 2,300 2,230 2,150 Loadbearing masonry Colour bond GFA (m) Floor construction Precast concrete Timber frame Timber frame 2,330 2,260 2,195 2,135 2,070 2,010 1,935 Brick veneer 2,450 2,385 2,320 2,250 2,185 2,120 2,040 Table 3: Pool construction costs (Sydney) Volume (1) Cost (AUD) Excavation, installation, Lighting Fencing Deck pump & filter 25,000 35,000 45,000 45,540 50,600 55,660 3,000 3,000 3,000 7,110 7,900 8,690 9,450 10,500 11,550 Solar heating 4,500 4,500 4,500 Table 4: Professional services costs Services Architectural services Quantity surveying services (Bills of Quantity) Works value (AUD) 100,000 500,000 1 million 5 million 10 million 100,000 500,000 1 million 5 million 10 million 100,000 500,000 1 million 5 million 10 million Fee (AUD) 12,000 42,500 75,000 225,000 350,000 3,700 7,500 15,000 75,000 125,000 1,000 7,500 13,500 37,500 50,000 Engineering services REGIONAL CENTRES - Location Cost Factors Albury Armidale Batemans Bay Bega Bowral Broken Hill Canberra Cobar Coffs Harbour Cooma Deniliquin Dubbo Forbes 1.029 1.114 1.075 1.107 1.039 1.278 1.026 1.305 1.059 1.127 1.107 1.076 1.104 Forster/Tuncurry Glen Innes Gosford Goulbum Grafton Griffith Gunnedah Katoomba Lismore Lithgow Moree Mudgee Muswellbrook 1.057 1.113 1.005 1.087 1.088 1.092 1.128 1.027 1.017 1.051 1.137 1.104 1.070 Narrabri Newcastle Nowra Orange Port Macquarie Sydney Tamworth Tweed Heads Wagga Wagga Wollongong Young 1.127 1.013 1.043 1.073 1.035 1.000 1.075 1.008 1.052 1.006 1.094 Figure 5: Cordell Cost Guide Location Cost Factors Question 4 (25 marks) At the early pre-construction phase, you have been asked to estimate the cost of constructing a motel for a site in Wollongong. Your client requires a 1,750m motel, constructed of brick veneer. The ensuite rooms at the motel will each be 30m. The motel will be single storey. The motel has a 35,000 litre pool with deck, fencing, lighting and solar heating. a) Using the data provided in the Tables 2 and 3, you need to estimate a lump sum figure for the construction of the motel, including fitout. You should also include professional fees within your costing (Table 4). Note any assumptions you make. (15 marks) b) The same client is considering constructing an identical hotel in Bega. Using the Cordell Cost Guide Location Cost Factors (Figure 5), estimate the lump sum construction cost for the same motel in the second location. (5 marks) c) What other items would you need to include in order to estimate the total project cost? (5 marks) Costing notes: Allowance of 15% of GFA (gross floor area) for walls, ancillary spaces, plant rooms etc. 5% allowance for landscaping costs including parking area. Cost of fit out (per room): 34,800 AUD (up to 25 rooms) 27,600 AUD (26 to 50 rooms) 31,200 AUD (51 to 100 rooms) 24,000 AUD (more than 100 rooms) Table 2: Motel construction cost (Sydney) . . . 1,000 1,500 2,000 2,500 3,000 3,500 4,000 Exterior wall Construction cost per square metre floor area (AUD) 2,580 2,510 2,440 2,370 2,300 2,230 2,150 Loadbearing masonry Colour bond GFA (m) Floor construction Precast concrete Timber frame Timber frame 2,330 2,260 2,195 2,135 2,070 2,010 1,935 Brick veneer 2,450 2,385 2,320 2,250 2,185 2,120 2,040 Table 3: Pool construction costs (Sydney) Volume (1) Cost (AUD) Excavation, installation, Lighting Fencing Deck pump & filter 25,000 35,000 45,000 45,540 50,600 55,660 3,000 3,000 3,000 7,110 7,900 8,690 9,450 10,500 11,550 Solar heating 4,500 4,500 4,500 Table 4: Professional services costs Services Architectural services Quantity surveying services (Bills of Quantity) Works value (AUD) 100,000 500,000 1 million 5 million 10 million 100,000 500,000 1 million 5 million 10 million 100,000 500,000 1 million 5 million 10 million Fee (AUD) 12,000 42,500 75,000 225,000 350,000 3,700 7,500 15,000 75,000 125,000 1,000 7,500 13,500 37,500 50,000 Engineering services REGIONAL CENTRES - Location Cost Factors Albury Armidale Batemans Bay Bega Bowral Broken Hill Canberra Cobar Coffs Harbour Cooma Deniliquin Dubbo Forbes 1.029 1.114 1.075 1.107 1.039 1.278 1.026 1.305 1.059 1.127 1.107 1.076 1.104 Forster/Tuncurry Glen Innes Gosford Goulbum Grafton Griffith Gunnedah Katoomba Lismore Lithgow Moree Mudgee Muswellbrook 1.057 1.113 1.005 1.087 1.088 1.092 1.128 1.027 1.017 1.051 1.137 1.104 1.070 Narrabri Newcastle Nowra Orange Port Macquarie Sydney Tamworth Tweed Heads Wagga Wagga Wollongong Young 1.127 1.013 1.043 1.073 1.035 1.000 1.075 1.008 1.052 1.006 1.094 Figure 5: Cordell Cost Guide Location Cost Factors

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Accounting Questions!