Question: Question 4. (30 points) ABC firm plan to open a new facility. The firm has five alternative location as shown in Table 4. The objective
Question 4. (30 points) ABC firm plan to open a new facility. The firm has five alternative location as shown in Table 4. The objective and subjective factors as well as the performance of that all the sites satisfy the critical factors tests. Rate the six sites on a scale of 0 to 1. Weight of the transportation networks is 0.2, weight of the construction land is 0.3, weight of the educational facilities is 0.2, the weight of Availability of qualified labour is 0.2 respectively. The alpha is 0.9 and determine the best location using hybrid method. Table 4 Site Number Objective Transportation Construction Educational Factor (total networks Land Facilities cost, mil. TL) A 40 Good Excellent Fair B 35 Fair Very Good Fair 25 Very Good Good Good D 15 Fair Very Good Good E 50 Fair Excellent Good Availability of qualified labour Very Good Excellent Fair Excellent Good
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
