Question: QUESTION 4 A quality Inspector took five samples, each with six observations, of the length of time (in minutes) for glue to dry. The analyst

QUESTION 4 A quality Inspector took five samples,
QUESTION 4 A quality Inspector took five samples,
QUESTION 4 A quality Inspector took five samples, each with six observations, of the length of time (in minutes) for glue to dry. The analyst computed the mean of each sample as 12.28, 12.20, 11.32, 12.66, and 11.50. Use this information and alpha risk of 0.04 to obtain control limits for means of future times. It is known from previous experience that the standard deviation of the process is 1.19 minute, STEP 1: Provide control limits for the mean chart: LCL CL UCLE STEP 2: The inspector continued to periodically sample the process and recorded values for six samples as shown in the following table. SAMPLE Observation 1 2 3 4 5 11.38 1 13.80 12.84 11 88 2 14.04 11.88 3 12.84 10.30 12.72 10.20 11.04 12.84 11.88 12.72 11.40 10.32 12.36 12.60 12.24 10.80 10.32 13.56 12.48 13.80 12 12 12.00 14 40 4 11.25 13.80 10.32 1108 5 1140 13.08 5 13.32 13 156 13.08 Enter the values you plot in mean chart, starting from the first sample: Sample 1 Chick Sound Submit to me and submit Click Save All Amerolog LANA Enter the values you plot in mean chart, starting from the first sample: Sample 1: Sample 2: Sample 3: Sample 4: Sample 5: Sample 6: Is the process in control (Enter YES or NO): NOTE: All computed values should be rounded to the nearest hundredth (two decimal after dot, for example 9.99)

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!