Question: Question 4 The primary factor causing a cost is called a cost allocation. materials requisition. cost driver. predetermined manufacturing overhead rate.
Question
The primary factor causing a "cost" is called a
cost allocation.
materials requisition.
cost driver.
predetermined manufacturing overhead rate.