Question: QUESTION 4 Transfer the load from the floor shown in Figure 1 on to column B 2 using tributary area method. Slab and beam sizes

QUESTION 4
Transfer the load from the floor shown in Figure 1 on to column B2 using tributary area method. Slab and beam sizes are as mentioned on the given framing plan. The floor has a superimposed dead load of 1.5 kPa and imposed live load of 3.5 kPa . There is a 2 m high faade on the periphery of the building. Self-weight of the faade in terms of surface area loading is 0.5 kPa .
Figure 1(Ouestions \(4,5\& 6)\)
QUESTION 4 Transfer the load from the floor shown

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!