Question: Question 5 ( 1 0 points ) : Lot - Sizing Problem The time - phased net requirements for the base assembly in a table

Question 5(10 points): Lot-Sizing Problem
The time-phased net requirements for the base assembly in a table lamp over the next six weeks are
\table[[Week,1,2,3,4,5,6],[Requirements,335,200,140,440,300,200]]
The setup cost for the construction of the base assembly is $300, and the holding cost is $0.50 per assembly per week.
a) Determine the lot sizes using the Silver-Meal heuristic.
b) Determine the lot sizes using the least unit cost heuristic.
 Question 5(10 points): Lot-Sizing Problem The time-phased net requirements for the