Question: QUESTION 5 1 points Save Answer (OM Tech c)* OM Tech is a job shop with the three production stations below. The rate shown at

QUESTION 5 1 points Save Answer (OM Tech c)* OMQUESTION 5 1 points Save Answer (OM Tech c)* OMQUESTION 5 1 points Save Answer (OM Tech c)* OMQUESTION 5 1 points Save Answer (OM Tech c)* OM

QUESTION 5 1 points Save Answer (OM Tech c)* OM Tech is a job shop with the three production stations below. The rate shown at each station is the process capacity of that station. 5/day 6/day 7/day X Y Z The process capacity of the entire system is (*Discuss briefly why.) O A. 6/day OB. 7/day o C. 5/day OD. 18/day QUESTION 6 (OM Tech 01 t)* OM Tech is a job shop with the three production stations below. The rate shown at each station is the process capacity of that station. 5/day 6/day 7/day Y z Suppose raw materials arrive at the rate of 7/day and demands for the final product originate at the rate of 6/day. The throughput (the rate at which the system generates money) is (*Discuss briefly why) O A. 31/day O B. 6/day OC. 7/day OD. 4/day O E. 5/day QUESTION 7 (OM Tech 01 i)* OM Tech is a job shop with the three production stations below. The rate shown at each station is the process capacity of that station. 5/day 6/day 7/day Y Z Suppose the process capacity (5/day) of station X is increased to 9/day. The process capacity of the entire system is (*Discuss briefly why) OA. 5/day OB. 9/day o C. 6/day OD. 22/day O E. 7/day QUESTION 8 (Smunt Manufacturing 02)* Smunt Manufacturing has the production system displayed below. The rate shown in each box is the process capacity of that operation. The drilling operation occurs separately from and simultaneously with the sawing and sanding operations. Assembly is needed in welding. The work in process then goes through one of the three finishing operations in parallel. Sawing Sanding Finishing (2.1/hr) (2.2/hr) (0.8/hr) Welding (2.5/hr) Finishing (0.8/hr) Drilling (2.3/hr) Finishing (0.8/hr) The bottleneck is (*Discuss briefly why.) O A. finishing OB. welding C. sawing O D. drilling E.sanding

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!