Question: Question 5: (a) For a compressor the probability of failure occurring during a given week is given in Table Q5(a). (i) Calculate the Annual Breakdown
Question 5: (a) For a compressor the probability of failure occurring during a given week is given in Table Q5(a). (i) Calculate the Annual Breakdown Maintenance Costs (where no Preventive Maintenance is carried out). The costs are 300 OMR to repair the compressor, every time it fails. (ii) Preventive maintenance costs 60 OMR for each service. Calculate if Preventive Maintenance is cheaper than Breakdown Maintenance, and if so how often Preventive Maintenance should be carried out. There are 48 working weeks in a year.
| Table Q5(a) | |||||||
| Week of Operation | Probability of failure during the given week | ||||||
| 1 | 0.00 | ||||||
| 2 | 0.15 | ||||||
| 3 | 0.15 | ||||||
| 4 | 0.30 | ||||||
| 5 | 0.40 | ||||||
(b) In a conventional production, operations of turning, splines cutting and grinding are followed in sequence to produce splined shaft for gear boxes and lathe, milling and grinding machines are used for the operations. The reliability of the lathe, milling machine and grinder are 0.89, 0.87 and 0.93 respectively. It has been suggested that to improve reliability two identical machines could be used at each stage. If one fails the other can be used while the first one is being repaired. Another suggestion has been put forward to buy a CNC machining center with a reliability of 0.90 which will do the functions of the lathe and the milling machine. Calculate the system reliability for each of the 3 layouts and decide which is the most reliable.

Figure Q5(b): Splined shaft Figure Q5(b): Splined shaft
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
