Question: Question 5 Zebazoko Consultants received a tender to develop a design for the 1 0 0 k m section of the Tutu road in Luapula

Question 5
Zebazoko Consultants received a tender to develop a design for the 100km section of the Tutu road in Luapula Province. Part of the project specifications entails advising the contractor, who will be responsible for road construction, on the appropriate type of aggregates to be sourced from the borrow pit. As a material engineer stationed at the
Prepared by: Mr. P Mpundu 2024
laboratory within Zebazoko Consultants HQ, you have been tasked with analyzing an aggregate sample obtained from a borrow pit, as detailed in Table 3. Your assignment involves calculating the sieve analysis of the aggregate and generating a plot on a semilog gradation paper using MS Excel graphs. What is the maximum size and why? What is the nominal maximum size and why?
Table: 3
\table[[Sieve Size,\table[[Amount],[Retaine g
Question 5 Zebazoko Consultants received a tender

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!