Question: Question 5 Zebazoko Consultants received a tender to develop a design for the 1 0 0 k m section of the Tutu road in Luapula
Question
Zebazoko Consultants received a tender to develop a design for the section of the Tutu road in Luapula Province. Part of the project specifications entails advising the contractor, who will be responsible for road construction, on the appropriate type of aggregates to be sourced from the borrow pit. As a material engineer stationed at the
Prepared by: Mr P Mpundu
laboratory within Zebazoko Consultants you have been tasked with analyzing an aggregate sample obtained from a borrow pit, as detailed in Table Your assignment involves calculating the sieve analysis of the aggregate and generating a plot on a semilog gradation paper using MS Excel graphs. What is the maximum size and why? What is the nominal maximum size and why?
Table:
tableSieve Size,tableAmountRetaine
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock
