Question: Question 6 Question 1 1 . 1 A small electrical appliance is to be produced on a single - model assembly line. The work content
Question Question
A small electrical appliance is to be produced on a singlemodel assembly line. The work
content of assembling the product has been reduced to the work elements listed in Table A
The table also lists the times for each element and the precedence order in which they must
be performed. The line is to be balanced for an annual demand of units each year.
The line will operate week a year, straight shifts per week. These shifts take a duration
of hours per day in a shift, however, there is minutes break in it There will be one
worker per station. Previous experience suggests that the uptime efficiency for the line will
be and repositioning time lost per cycle will be min.
Table A:
Requirements:
a How would you design the Precedence diagram for the above?
b Determine the cycle time Tc
c Determine the minimum number of workers required on the line.
d Determine the service time Ts to which the line must be balanced.
A standard deck of cards is being used to play a game. There are four suits hearts diamonds,
clubs, and spades each having faces ace jack, queen, and king
making a total of cards. This complete deck is thoroughly mixed, and you will receive the
first cards from the deck without replacement.
a What is the probability that both cards are kings? Marks
b What is the probability that the first card is a and the second card is a or a
Marks
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock