Question: Question 6 The predetermined overhead rate equals one - twelfth of estimated overhead. actual overhead divided by actual activity level for a period. actual overhead
Question
The predetermined overhead rate equals
onetwelfth of estimated overhead.
actual overhead divided by actual activity level for a period.
actual overhead minus estimated overhead.
estimated overhead divided by estimated activity level for a period.
actual overhead multiplied by actual activity level for a period.