Question: Question 6 The table below shows point data collected from a topographic survey. Twenty - five points were considered. Table 1 : Topographic data

Question 6
The table below shows point data collected from a topographic survey. Twenty-five points were considered.
Table 1: Topographic data
\table[[POINTID,Easting [m],Northing [m],Elevation [m],POINTID,Easting [m],Northing [m],Elevation [m]],[a,0,0,1000.000,n,30,20,1006.980],[b,10,0,999.630,0,40,20,1007.080],[c,20,0,999.050,p,40,30,1008.850],[d,30,0,998.480,q,30,30,1010.070],[e,40,0,996.030,r,20,30,1009.980],[f,40,10,1002.770,5,10,30,1010.290],[g,30,10,1003.770,t,0,30,1011.980],[h,20,10,1006.420,u,0,40,1014.750],[i,10,10,1008.600,v,10,40,1014.230],[j,0,10,1008.780,w,20,40,1004.100],[k,0,20,1010.730,x,30,40,1003.740],[1,10,20,1010.400,y,40,40,1002.270],[m,20,20,1008.630,,,,]]
a) Using elevation data in table 1 above, sketch a contour map of 2 m interval. [12 marks]
b) A vertical excavation is to be made within a closed polygon 'c-e-o-m-c' to a reduced level of 993.53 m . Calculate the volume of earth to be excavated. [8marks]
Question 6 The table below shows point data

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!