Question: Question 8 ( 2 0 % ) You are working on a concrete mix design that requires each cubic yard of concrete to have 0

Question 8(20%)
You are working on a concrete mix design that requires each cubic yard of concrete to have 0.45 water-cement ratio, 1963lbyd3 of dry gravel, 4% air content, and 565lbyd3 of cement. The available gravel has a specific gravity of Ggravel=2.7, a moisture content of 1.6%, and absorption of 2.4%. The available sand has a specific gravity of Gsand=2.5, a moisture content of 4.8%, and absorption of 1.5%. For each cubic yard of concrete needed on the job, calculate the weights of cement, moist gravel, moist sand, and water that should be added to the batch.
Question 8 ( 2 0 % ) You are working on a

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related Civil Engineering Questions!