Question: Question Consider the project data given in Table 1 and answer the following questions: 1.1 Draw an activity on arc diagram of the project schedule.

Question Consider the project data given in TableQuestion Consider the project data given in Table

Question Consider the project data given in Table 1 and answer the following questions: 1.1 Draw an activity on arc diagram of the project schedule. (3) 1.2 Identify the critical path and its duration (2) 1.3 What is the normal total cost of the project? (2) 1.4 If the total fixed cost per day is R10000 of which R5500 is discretionary, set out the programme to be followed to achieve the minimum project costs and determine the reduced total project time at this minimum cost. (15) 1.5 What is the minimum project cost after acceleration? (2) Table 1 Project Data PROJECT DATA Activity Predecessor Normal Time [days) Cost Slope 6 Normal Accelerated Accelerated Cost [R] Time [day] costs [R] 12 000 20 000 24 000 4 48 000 18 000 2. 20 000 4 B A 8 3 1,B FHC D 6 18 000 4 24 000 E A 6 36 000 4 54 000 F 10 10 000 6 50 000 G 5 20 000 3 30 000 mm H 40 000 6 50 000 N 00 1 2 20 000 2. 20 000

Step by Step Solution

There are 3 Steps involved in it

1 Expert Approved Answer
Step: 1 Unlock blur-text-image
Question Has Been Solved by an Expert!

Get step-by-step solutions from verified subject matter experts

Step: 2 Unlock
Step: 3 Unlock

Students Have Also Explored These Related General Management Questions!