Question: Question content area top Part 1 Choose the correct description of variable and fixed costs. Question content area bottom Part 1 A . A variable
Question content area top
Part
Choose the correct description of variable and fixed costs.
Question content area bottom
Part
A
A variable cost changes in total in proportion to changes in the related level of total activity or volume, such as a sales commission that is a percentage of each sales revenue dollar. A fixed cost remains unchanged in total for a given time period, despite wide changes in the related level of total activity or volume, such as a fixed annual leasing cost of a machine.
B
A variable cost is considered to be a unit cost such as the perattendeecost of hiring a musical group to perform at an event. A fixed cost is considered to be a total cost such as the total fee paid to the musical group for performing at the event.
C
A variable cost is related to a particular cost object and can be traced to it in an economically feasible way, such as the cost of steel in the manufacturing of a luxury car. A fixed cost is related to a particular cost object but cannot be traced to it in an economically feasible way, such as the salary of a plant manager who oversees production of many different types of luxury cars produced at the same plant.
D
All of the above.
Step by Step Solution
There are 3 Steps involved in it
1 Expert Approved Answer
Step: 1 Unlock
Question Has Been Solved by an Expert!
Get step-by-step solutions from verified subject matter experts
Step: 2 Unlock
Step: 3 Unlock