Question: Question Five Two different production lines ( B and C ) consist of 4 and 3 operations as sketched below: The probability of zero defect
Question Five Two different production lines ( B and C ) consist of 4 and 3 operations as sketched below: The probability of zero defect at the end of the production line is 0.983 and 0.9893 , respectively 1- Find the probability of zero defect unit for each operation of the production lines B and C. 2- Use the information above to estimate the Sigma-level for each production line
Step by Step Solution
There are 3 Steps involved in it
Get step-by-step solutions from verified subject matter experts
