Question: Question III ( 3 0 % ) : A soil fill having a thickness of 5 m is to be made of a soil with

Question III (30%): A soil fill having a thickness of 5 m is to be made of a soil with a Proctor maximum dry unit weight of 20kNm3 and an optimum moisture content of 14%. This fill will be compacted at optimum moisture content to an average relative compaction of 95%. The underlying soils in the field are shown in Figure below. Find the total consolidation settlement in the clay layers caused by full consolidation under the soil fill load.
BEDROCK